• Recent
    • Tags
    • Popular
    • Register
    • Login

    Please Note This forum exists for community support for the Mango product family and the Radix IoT Platform. Although Radix IoT employees participate in this forum from time to time, there is no guarantee of a response to anything posted here, nor can Radix IoT, LLC guarantee the accuracy of any information expressed or conveyed. Specific project questions from customers with active support contracts are asked to send requests to support@radixiot.com.

    Radix IoT Website Mango 3 Documentation Website Mango 4 Documentation Website Mango 5 Documentation Website

    Bargraphs not filled

    Mango General
    4
    15
    3.1k
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • J
      JF89
      last edited by

      Hello,

      Whether I use the step or bar option, I can not get any bargraphs filled.

      What is missing from my settings?

      Best regards

      0_1565077097796_bargraph.png
      0_1565077115469_bargraph_config.png
      0_1565077131379_bargraph.png

      1 Reply Last reply Reply Quote 0
      • BGB
        BG
        last edited by

        This post is deleted!
        1 Reply Last reply Reply Quote 0
        • CraigWebC
          CraigWeb
          last edited by CraigWeb

          Hi @JF89

          Can you show what is happening when you stake all the settings off the watchlist? Your first picture and the 3rd picture is the same.
          The watchlist will use the default point chart setting which is set to bar. What is the logging interval on your kwH point, if you use delta it will show the delta between log entries if there is no change then the bar will be 0.
          Id like to see what happens I you change the rollup interval to 1 hour by changing it on your date bar.
          0_1565087683379_Screen Shot 2019-08-06 at 12.33.50.png

          1 Reply Last reply Reply Quote 0
          • phildunlapP
            phildunlap
            last edited by

            Hi JF89,

            I was not able to replicate, though I did notice I had to refresh the watch list page after changing the chart settings on the data point to have them take effect. Could that be related? I see you're on 3.6, but is it the latest release?

            1 Reply Last reply Reply Quote 0
            • J
              JF89
              last edited by

              @phildunlap said in Bargraphs not filled:

              I was not able to replicate, though I did notice I had to refresh the watch list page after changing the chart settings on the data point to have them take effect. Could that be related? I see you're on 3.6, but is it the latest release?

              Hello Phil and BG,

              I tried to record one hour, but I do not have a bar graph anymore.
              I tried to change the step option to bar without success.
              I tried to have a display on one hour, but without success.
              (I specify that this is a counter on a numeric value, the rollup is set to Delta)
              at 11 pm, I put the recording on one minute, and I finally got a bar, but still without being filled.
              I don't know if the software is up to date ?
              I havent got the advance scheduler on Mango .
              Do i have to dowload that module especially ? (it should have been with all the package 3.6 ? No ?
              Best regards
              0_1565125972962_version mango.png
              0_1565126126511_version mango 2.png
              0_1565126145647_last 3 hours.png

              0_1565126159263_a 23 heures.png
              0_1565126178586_last hour.png

              1 Reply Last reply Reply Quote 0
              • phildunlapP
                phildunlap
                last edited by phildunlap

                I havent got the advance scheduler on Mango .

                Do i have to dowload that module especially ? (it should have been with all the package 3.6 ? No ?

                Yes, I believe it should have been in the bundle download on the store if that's what you mean, yes. You can install it from the modules page by checking for updates, it would appear in the "available for installation section". It's not clear if you're fully up to date from the images you posted.

                It does appear to be missing from the bundle currently, so I'll look into that and thanks for bringing it to our attention.

                I tried to change the step option to bar without success.

                Assuming you are fully up to date, does this happen every time? As I said, I was not able to replicate. Can you give more detailed instructions on how to cause the issue?

                J 1 Reply Last reply Reply Quote 0
                • CraigWebC
                  CraigWeb
                  last edited by

                  Can you show us a bar graph and its settings that are not working? I don't see what is wrong with the step chart. It is showing the delta of the point?

                  J 1 Reply Last reply Reply Quote 0
                  • J
                    JF89 @phildunlap
                    last edited by

                    @phildunlap

                    Hello Phil,

                    After installing the latest version 3.6.4 and advanced sheduler packages, I can not get the program ( in Event Handlers) I just programmed into the UI.
                    Screen copy attached
                    Best regards

                    0_1565185837327_advanced_schedule2.png

                    i followed the tutorial, but Nothing in Event Handlers !

                    0_1565185936338_advanced_schedule.png

                    1 Reply Last reply Reply Quote 0
                    • J
                      JF89 @CraigWeb
                      last edited by

                      @craigweb
                      Hi Craig,

                      Here is what I expected to have, as chart for the meter (filled in orange)
                      0_1565188885262_watchlist_meter_temp2.jpg

                      And here is what I actually have for the counter, regardless of the setting chosen step or bar:
                      the interior of the graph bar is not filled, as I hoped. (It's just a question of aesthetics, and in my opinion it's prettier when it's filled)
                      0_1565188937861_watchlist_meter_temp2.png

                      In yellow, it is a temperature represented in bar form, and logging point every 1 minute
                      The counter in orange, has a setting on the rollup with Delta, and logging point every 10minutes.

                      Best regards

                      1 Reply Last reply Reply Quote 0
                      • CraigWebC
                        CraigWeb
                        last edited by CraigWeb

                        Ok thanks for that, can you go the data point details page of COMTAGE CLiM and show us what the chart is doing there. That is definitely not a bar chart, a bar chart has the time stamp in the middle of the bar look below. That is a step chart.
                        We just need to figure out why it is changing to a step chart
                        0_1565189609933_Screen Shot 2019-08-07 at 16.52.38.png

                        1 Reply Last reply Reply Quote 0
                        • J
                          JF89
                          last edited by

                          Hello Craig,

                          It's very strange, because in the EDIT menu of the variable COUNT CLIM, I have the graph that is displayed as a bar graph filled, as you will see on the following screen recopies.
                          Why then, the bar chart does not appear as a bar in the Watch list? (but only a vertical line), or bar not filled.

                          Best regards

                          0_1565209929533_watchlist comptage clim.png

                          0_1565209943758_watchlist comptage clim2.png
                          0_1565209958233_watchlist comptage clim3.png
                          0_1565210074106_watchlist comptage clim4.png

                          1 Reply Last reply Reply Quote 0
                          • phildunlapP
                            phildunlap
                            last edited by

                            It looks like it's a static watchlist. You can save a static watchlist with a series selected and charted with a chart type other than its default. if you check the Configure all points/series checkbox below the chart, do any of the series have a chart type selected in that setting?

                            Even if it were saved that way, though, removing the point from the chart and adding it back was sufficient for me to see it change back to its configured chart type rather than it's saved type.

                            1 Reply Last reply Reply Quote 0
                            • J
                              JF89
                              last edited by

                              Hello Phil,
                              you were right, ticking the configure all points option, the counter is declared in step instead of bar.

                              When in the Watch list, I only have the counter, the graph bar is correctly displayed as a bar.
                              But when in this Watch list, I add a temperature, the graph bar of the meter is transformed into a vertical line
                              if I delete the counter and reactivate it, I still have the same problem.

                              Is it really possible to mix the two types of bar and line curves in the same graph?

                              Thanks for your help

                              Best regards
                              0_1565245134652_watch_list_bar.png
                              0_1565245166927_watch_list_cpt_temp.png
                              0_1565245184254_watch_list_cpt_temp2.png

                              1 Reply Last reply Reply Quote 0
                              • CraigWebC
                                CraigWeb
                                last edited by

                                Hi @JF89

                                If you want a chart like this:
                                0_1565247206488_Screen Shot 2019-08-08 at 08.52.08.png
                                You will need to add a rollup to your point that is on the line chart. :
                                0_1565247352813_Screen Shot 2019-08-08 at 08.55.35.png
                                Also make sure that your databar is set to auto :
                                0_1565247360767_Screen Shot 2019-08-08 at 08.54.48.png

                                1 Reply Last reply Reply Quote 0
                                • J
                                  JF89
                                  last edited by

                                  Hello Craig,

                                  Thank you very much.
                                  It works .
                                  Best regards
                                  0_1565277332048_watch list meter and temp.png

                                  1 Reply Last reply Reply Quote 0
                                  • First post
                                    Last post