Hi,
I have an irrigation system running, among other things) and require sequential switching for 6 Modbus outputs.
The system runs 4 times a day, S1 ON for 5 mins, then OFF, S2 ON for 5 mins then OFF, and so on.
I have setup scheduled events just to get going, but there must be a better way.
It would be good to be able to enable/disable each solenoid, and the whole system. Also be able to adjust solenoid run times, and maybe even start times from the GUI.
I also looked at a scripting data source, with virtual points to set the timings, but stopped, as I didn't know if this was the best way.
I am not after anyone to do it for me, just point me in the best direction.
It has probably been done before, and would be useful for many applications.
Hayden