<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Better representation of changes on graphs]]></title><description><![CDATA[<p dir="auto">The default setting for loggint is "when point value changes". I understand this is for saving database space, a good reason. However, consider this scenario: I am counting the number of clicks of a switch from a device. Let's say it is at 10 from 7:00 until 7:59, and at 8:00 it reaches 11. In the current setup (at least on my version) if I select "when point value changes" then on the graph in mango there would be a straight line from 7:00 until 8:00. This is not really accurate however, as there really should be a line from 7:00 to 7:59 and a line from 7:59 to 8:00, which which show the jump, rather than a only slightly inclined line. This can be accomplished by saving every data point, but in the interest of saving space it could probably be optimized.</p>
<p dir="auto">To sum it up, my wish is: if "when point value changed" is selected, then draw a line from the first data point to the point BEFORE the value changes, and then connect this point to the changed value.</p>
<p dir="auto">Thanks.</p>
]]></description><link>https://forum.mango-os.com/topic/840/better-representation-of-changes-on-graphs</link><generator>RSS for Node</generator><lastBuildDate>Mon, 16 Nov 2026 13:57:09 GMT</lastBuildDate><atom:link href="https://forum.mango-os.com/topic/840.rss" rel="self" type="application/rss+xml"/><pubDate>Fri, 27 May 2011 16:47:09 GMT</pubDate><ttl>60</ttl></channel></rss>